Hot Stamping Machine for Pmma Edgebands
-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Jiangsu
-
Validity to:
Long-term effective
-
Last update:
2020-08-27 07:50
-
Browse the number:
437
Company Profile
Wuxi Yuda Light Industry Machinery FactoryBy certification [File Integrity]
Contact:ydqgjx(Mr.)
Email:
Telephone:
Phone:
Area:Jiangsu
Address:Jiangsu
Website:http://www.cnyudajixie.com/ http://ydqgjx.ttspfs.com/
Product Details
Description of hot stamping machine for abs fridge profiles
Part 1. Application:
☆ This OTR100 Model hot stamping machine is special designed for decorating various PVC/PS/WPC/ABS/PVC foaming small profiles within 100mm widths; Now it is special used to decorating imitation marble stone profiles.
Part2. The technical parameter of machine:
Part 3: Basic assembly of OTR100
3.1) Transmitting unit
① The whole machine adopts 50*50 square tube and Q235 steel plate to weld.
② It adopts angle iron to make conveying table.
3.2) The angle adjustment unit
① It adopts Q235 steel plate to make base-plate, clipboard and joint-plank.
② It adopts 160 hand-wheel to adjust thermoprinting angle by worm wheel and worm.
3.3) The head of stamping control unit
① It adopts Q235 steel plate to make erect plank, plank of air cylinder; and 63*150 air cylinder to control the stamping head work back and forth.
② It adopts ZL102 with the copper slipcover to make guide thimble, and 45 steel for guide pole.
3.4) The stamping head unit
① It adopts ZL102 to make base-plate of thermoprinting which connect between slide shaft and slide seat.
② It adopts 25w gear speed-down motor to drive stamping roller by gears.
3.5) winding & unwinding unit
① It adopts 45# steel to make shaft and Q235 to make joint plate.
② It adopts organic glass to make clamp for clamping film and aluminum loop to make fixed components.
3.6) Electric control unit
① It adopts cold rolled steel to make electric container.
② The electric components of equipment adopts famous brand in home market.
Part 4. Flow chart of OTR100
Part 5. Payment and Delivery time
1) Delivery time: Approx. 40days from receipt of down payment.
2) Payment: 30% advance payment with order by T/T;
70% balance payment paid before shipment by T/T.
3) Guarantee: the machine is under warranty for one year, but not including the artificial wrong operation.
http://www.cnyudajixie.com/
- Analysis Instrument
- Auto Repair Equipment & Tools
- Detector
- Medical Diagnosis Equipment
- Test Instrument
- Color Card & Color Comparator
- Geographic Surveying Instrument
- Meter for Liquid & Gas
- Physical Measuring Meter
- Weighing & Measuring Apparatus
- Optical Lens & Instrument
- Lab Utensil and Disposable
- Laboratory Instruments
- Beauty Equipment
- Demonstrational & Teaching Utensil
- Dental Apparatus
- Universal Medical Implement
- Other Instruments & Meters